Deploy Your Data Center in 18 Months, Not 5 Years
Access 1,000 GW of ready grid capacity. Skip the 5-year interconnection queue with surplus interconnection.
1000
GW Available
18
Months Deploy
1000+
Sites Ready
Real-Time Grid Intelligence
Fast Track
18 months
Data Centers
100+ MW
Efficiency
99.9%
Grid Ready
1000 GW
A Unique Opportunity for Deploying Data Centers with FERC Order 845
America's AI Infrastructure Bottleneck
The grid can't keep pace with AI's explosive growth. Critical infrastructure is trapped in decade-long queues while the digital economy waits.
0TWh
AI Data Center Demand
Projected energy demand by 2030
0GW
Capacity in Queue
Stuck in interconnection bottlenecks
5-6Years
Average Wait Time
For new grid connections
65-90GW
Data Center Capacity
Needed by 2029 for AI growth
0GW
Total Load Growth
US forecast 2025-2029
0%
Coverage Gap
Only this much peak load growth covered
The Solution: Surplus Interconnection
Deploy clean AI infrastructure in 1-2 years using existing grid connections at underutilized power plants
Surplus Interconnection Configuration
Deploy data centers with 95% renewable energy using existing gas plant interconnections
Configuration Setup
100MW Gas Plant
Existing Infrastructure
100MW Data Center
High-Performance Computing
500MW Solar Array
5x Oversized Capacity
1600MWh Battery
Long-Duration Storage
Key Benefits
95% Renewable Energy
Solar + Storage Primary Power
18-Month Deployment
Skip 5-Year Queue
99.99% Uptime
Gas Backup Reliability
FERC Order 845
Regulatory Compliant
System Architecture

This configuration enables data centers to achieve sustainability goals while maintaining enterprise-grade reliability, all while bypassing traditional interconnection delays.
Deployment Timeline Comparison
Traditional Interconnection
New grid connection, full study process
5-6 Years
Surplus Interconnection
Behind-the-meter, existing connection
1-2 Years
Deploy AI infrastructure 3-4 years faster